แสดงบทความที่มีป้ายกำกับ Drilling แสดงบทความทั้งหมด
แสดงบทความที่มีป้ายกำกับ Drilling แสดงบทความทั้งหมด

วันจันทร์ที่ 6 กุมภาพันธ์ พ.ศ. 2555

RS Rentals Caisson Drilling, Excavation, Construction

We provide foundation drilling for foundation caissons, retaining wall piles, shoring, swimming pools, soils testing, percolation testing, and slope stabilization in San Fernando Valley, Los Angeles, Orange County, and Santa Barbara Counties. We also drill geology test holes and soils percolation test holes. Limited access drilling rigs are available. We are fully insured and our job sites are OSHA compliant. DRILLING / SHORING Providing hillside drilling for caissons, seepage pits, foundations, retaining walls, temporary shoring, and permanent shoring. Piles, or caissons are engineered to support structures such as foundations, retaining walls, pools, or to stabilize failing hillsides. Drill rigs drill through unstable soil in order to reach bedrock. Steel re-bar cages are placed in to the drilled hole and then it is filled with concrete. Typically grade beam foundations are placed over a grid of piles or a retaining wall is built bearing on a grade beam that is tied to the drilled piles. Our equipment is capable of drilling diameters between 18" to 60" to depths of 70 feet. For jobs with limited access we need only 54" clearance, 10' access height and 13.5' operating height overhead clearance. No matter how large or small your next project is, we're sure you'll benefit from having us on your team. Contact: Adolfo or Rick 818-994-1959



http://www.youtube.com/watch?v=8zTdlA567yo&hl=en

Recommend : หมวดงานอื่นๆ บทความวิศวกรรมโยธา Structural Engineer Plan of Construction

วันพฤหัสบดีที่ 26 พฤษภาคม พ.ศ. 2554

Drilling

1/12/2011. As work continues on Phase 1 of KRMC's new surgical tower, contractors here are drilling a foundation test pile to a depth of 30 to 50 feet in order to determine soil bearing capacity. Four of these 6- to 8-inch diameter piles will be drilled per column to support a five-story building. In the second scene, crew members use hand shovels to excavate four feet deep and prepare the platform for the pile-driving operation.



http://www.youtube.com/watch?v=FultUOFo-5A&hl=en

See Also : Civilteam Laptop Black Friday Deals